Author: Caroline Haywood

To meet rising demand at Micron Eagle we are delighted to announce our current recruitment drive, as we search for two Hydraulic Technicians. The positions will be workshop based with normal hours of work 8am to 5pm Monday to Thursday and 8am to 2:30pm Friday,...

As we all know contamination in hydraulic systems is the main cause of component failure. A high contamination level will reduce the life of components and result in down time and costly repair/replacement costs. By utilising the correct filtration and supplementing your conditioning capabilities with either...

Have you had a system component fail and then discovered that a replacement unit is on a long lead time? With an extensive stock holding of parts and SERVICE EXCHANGE units Micron Eagle Hydraulics will be able to get you back up and running as...

Micron Eagle Hydraulics Ltd, with fully equipped workshops in Aberdeen and Houston, are ideally placed to undertake the repair, refurbishment and overhaul of your hydraulic components. Test Rigs that accommodate in excess of 450HpReturn units to manufacturers original specification or customer specific requirements, Repair or...

Do you regularly assess the condition of your system fluid? The condition of the fluid can directly affect the performance and longevity of your system, keeping on top of the fluid cleanliness can extend uptime, and act as a precursor to potential breakdowns, providing you with...

The majority of equipment manufacturers provide guidelines for the recommended cleanliness of a system for operation of their equipment. These cleanliness levels are for guidance only and are typically the maximum acceptable level, rather than a target! Regular monitoring of your system fluid condition, allows you...

Micron Eagle enjoy being able to help our customers when they have been told "it's not possible in that time frame". Recently, we had a customer in dire need of replacement units, an Eaton Hydrokraft pump and motor. Due to current supply chain issues there...

Our Engineering team were tasked to provide assistance in the pre-mobilisation and installation of replacement flexible hose assemblies to a large offshore system. Phase 1 was to take delivery of the replacement system flexible hose set. Inspect and confirm the assemblies received were correct and...

As a Danfoss Power Solutions Distributor we are ideally placed to assist you with selecting the best component for your application. Whatever your application, Danfoss PVG valves can be configured to suit, with a comprehensive range of configurations i.e. high / low flow control, pressure control,...